Subject: Master Newsletter 7/19/99

Purpose

The purpose of the MASTER newsletter is to keep interested individuals informed on developments with the MASTER instrument. We are always happy to answer more detailed questions if you have them.

Validation Update

An inflight validation experiment was held in December to validate the data from the MASTER instrument when flown on the B200 aircraft. The experiment involved flying MASTER over L. Meade and Ivanpah playa at 3 altitudes and comparing the predicted instrument radiance from field measurements at the overpass time to the MASTER radiance. Ports 1, 2 and 4 of the MASTER instrument were validated corresponding to the VNIR, SWIR and TIR channels respectively. The results were v. good, the VNIR-SWIR performance was comparable to AVIRIS and in the TIR the predicted values for the 8 window channels agreed to better than a few tenths of a degree. A full report is available on the web site under validation. The MIR channels were not validated since they are still fairly noisy. This should be addressed with the addition of a linear variable filter later this year.

Data Ordering Update

Any data acquired by MASTER can now be ordered from the Distributed Active Archive Center (DAAC). This is a v. simple process. Go to the MASTER website, decide which flights you want to order, based on the quicklooks, and submit an order online. You can order data on either CD or 8mm tape. There is a small cost to avoid frivilous requests ($15 per tape; $10 per CD).

Acquisition Update

Thus far the following data sets have been acquired:

L Meade/Ivanpah (Dec 1998)
Salton Sea (Jan 99)
Baja (5-5-99)
Phoenix, AZ (6-5-99)
Silver Peak, NV (6-9-99)
Goldstone, CA (5-29-99)
Death Valley, CA (6-10-99)
Cuprite, NV (6-9-99)
Ray Mine, AZ (Day/night flts) (6-7&8-99)
Jornada Exper. Range and (6-1-99) Sevillita, NM (6-1&3-99)
Albuquerque/El Paso (6-3&4-99)
Mountain Pass (5-11-99)

The date in () indicates when acquisition was complete. The first 2 data sets listed above can be ordered on-line and some of the third dataset. The other data sets will be made available as soon as the data processing is complete.

Integration Update

MASTER has been integrated into the DC-8 and once a successful validation experiment is completed will be declared operational on that platform. MASTER will be deployed on the DC-8 in the upcoming PAC-RIM II experiment.

Unsubscribe To unsubscribe from these updates send an email with your name and unsubscribe to simon.j.hook@jpl.nasa.gov

The MASTER Team

http://masterweb.jpl.nasa.gov

http://asapdata.arc.nasa.gov

http://edcwww.cr.usgs.gov


Archive Data Software Newsletter Reference Schedule Team Contacts

PRIVACY/COPYRIGHT
Copyright California Institute of Technology
ALL RIGHTS RESERVED
U.S. Government Sponsorship Acknowledged
under NAS7-1407 CL 00-1237

This Page has been hit 120,641 times since 04/04/03.
Last Changed: 4/4/2003 2:41:30 PM
Sponsored by ASTER